Repair and temporary dam at Mount Polley Mine near Williams Lake.

Mount Polley design, steep additions led to failure

Glacial layer in dam base not understood, plans to buttress slope put off until weight of water and tailings caused breach

The Mount Polley mine dam failed because of an overlooked glacial material layer in the foundation and a series of steep additions that eventually overcame it, an independent engineering review has concluded.

“Basically the weight of the dam was too much for the weak materials in the foundation to bear,” said U.S. consulting engineer Steven Vick, one of three experts called in to examine the failure that caused the dam to breach and fail in August 2014.

The report concludes that the concrete-like glacial till material in the base of the dam wasn’t understood in enough detail when the dam was designed and built in 1997. Later raising of the dam to hold more water and tailings weakened the base layer and led to the failure.

Vick said the additions to the dam were built at a steeper slope than the original dam, and plans to buttress the area were delayed until it was too late.

Energy and Mines Minister Bill Bennett said the report shows there were no warning signs, and no surface inspections could have detected the problem that was overlooked in the design and original construction.

Two more investigations of the mine failure are pending. Bennett said the Chief Inspector of Mines is likely to release his report by June, and the Conservation Officers’ Service will also report when its investigation is complete.

Bennett said the government is willing to see the Mount Polley mine reopen, but the other investigations must be complete first. The parent company Imperial Metals has applied to use an existing pit to store tailings and resume operations without using the original tailings pond again.

 

Just Posted

GALLERY: Storm causes damage along the waterfront in Greater Victoria

Municipal crews are cleaning up Monday following Sunday’s high wind and waves

Woodwynn Farms to be shut down and sold

The rehabilitation program at Woodwynn Farms is being shut down. According to… Continue reading

FISHING ADVENTURES: Winter fishing season in full swing

Upcoming fishing events include Local Pub’s Salmon Superbowl Derby and Victoria Boat Show

Victoria Women’s March draws hundreds

Pink pussy hats aplenty as demonstrators took to downtown streets

Sooke Riptide soccer team advances to Lisa Cup Finals

Riptide defeats Gorge in shootout on Saturday afternoon

Backyard of $2.2M Uplands property bulldozed for BMX jump track

34-year-old financial advisor fulfills childhood dream

Butchart Gardens is hiring now and paying more

Wages start at $15, job fair Feb. 20

Lawyers slam ‘de facto expulsion’ of student guilty of sexual interference

Calgary student guilty of sexual assault of a minor allowed to finish semester

Cash still needed for Stelly’s Cross Path

MLA Olsen wants more specifics first

B.C. NDP set to restructure union bargaining

School trustees to regain control over employer group

A new development surrounding plane that went missing around Revelstoke in November

The family of Ashley Bourgeault believe they have found a new clue

$130K could get you on a dive to the Titanic

Hot summer ticket: $130K could get you on a dive to the Titanic off Newfoundland

UK’s Princess Eugenie, daughter of Prince Andrew, engaged

Princess Eugenie, the daughter of Prince Andrew and his ex-wife Sarah Ferguson, will marry Jack Brooksbank in Autumn 2018

German nurse charged with 97 more murders

Niels Hoegel, serving a life sentence for two murders, has been indicted in nearly 100 more killings.

Most Read