Premier John Horgan posted an apology on Twitter Feb. 17, 2021, to a fellow ‘John Horgan’ who has been receiving complaints about SkyTrain project delays. (John Horgan/Twitter)

Premier John Horgan posted an apology on Twitter Feb. 17, 2021, to a fellow ‘John Horgan’ who has been receiving complaints about SkyTrain project delays. (John Horgan/Twitter)

People have been complaining about SkyTrain project delays to the wrong John Horgan

Professor John Horgan teaches psychology 4,700 kilometres away in Georgia State University

British Columbians have been writing to John Horgan to voice their frustration on the delayed SkyTrain project to the University of B.C. – but somehow have confused the province’s premier with a professor 4,700 kilometres away with the same name.

Professor John Horgan, who teaches psychology at Georgia State University, took to Twitter Wednesday to let his “Canadian friends” know that those writing to him have the wrong man.

“I appreciate your frustration and know there are implications for the whole province not just UBC, but I am not the John Horgan you seek.”

In response, the premier apologized for the mixup along with a photo of a handwritten card.

“When it’s safe, you’ll have to come visiti beautiful B.C.”

Earlier this month, Prime Minister Justin Trudeau announced plans to spend $14.9 billion in funding over the next eight years on public transportation projects around the country, including in Metro Vancouver.

Extending the Broadway SkyTrain to the university campus is part of the Mayors’ Council 10-year vision, with a price tag of $3.3 to $3.8 billion.

ALSO READ: TransLink lays out costs for light rail, SkyTrain to UBC

Details on what federal funding will be doled out to B.C. projects have not yet been determined.


@ashwadhwani
ashley.wadhwani@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Want to support local journalism? Make a donation here.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

The Berwick Retirement Communities’ 2021 Spin-A-Thon event on Feb. 23 raised more than $7,100 for the Heart and Stroke Foundation. (Travis Paterson/News Staff)
Berwick Spin-A-Thon raises more than $7,000 for Heart and Stroke Foundation

Two centenarians among participants in second annual all-day pedal event

This was the scene outside North Saanich’s Parkland Secondary School after an attempted but unsuccessful break-and-enter into the school torched an ATM inside of it. Sidney/North Saanich RCMP did not make any arrests and currently lack suspects as the investigation continues. Members of the public who may have witnessed something or possess other information can contact police at (250) 656-3931 or to Crimestoppers at 1-800-222-TIPS. (Submitted)
ATM at North Saanich high school torched during early morning break-and-enter

Police dogs searched the exterior and interior of the school

Victoria’s Swartz Bay terminal. (Black Press Media file photo)
BC Ferries offers cheaper, prepaid fare options

Ferry service preparing for busy terminals when travel restrictions are lifted

Victoria Police Department vehicle outside the headquarters building. VicPD (Black Press Media file photo)
Man arrested after Victoria restaurant worker punched, thrown to the ground

Police say woman was found lying on the sidewalk with non-life threatening injuries

Victoria police are investigating after several vehicles were smashed and a basement was flooded along lower Cook Street March 2. (Black Press Media file photo)
Victoria police investigating smashed vehicles, flooded basement on Cook Street

Police seeking witnesses, footage of several ‘mischief’ incidents

Anyone with information on any of these individuals is asked to call 1-800-222-TIPS (8477) or visit the website victoriacrimestoppers.ca for more information.
Greater Victoria Crime Stoppers wanted list for the week of March 2

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

(Black Press Media file photo)
POLL: How’s your butter?

Recent reports have some Canadians giving a second look to one of… Continue reading

A sample of guns seized at the Pacific Highway border crossing from the U.S. into B.C. in 2014. Guns smuggled from the U.S. are used in criminal activity, often associated with drug gangs. (Canada Border Service Agency)
B.C. moves to seize vehicles transporting illegal firearms

Bill bans sale of imitation or BB guns to young people

The City of Duncan will implement a new pilot project targeting vandalism this spring. (File photo)
Graffiti trouble? Duncan will give you the brush and the paint to remove it

Intiative based on a successful project to protect Port Alberni from unwanted spray paint

BC Housing minister David Eby is concerned that Penticton council’s decision to close a local homeless shelter will result in a “tent city” similar to this one in Everett, Wa. (Olivia Vanni / Black Press file)
‘Disappointed and baffled’ B.C. housing minister warns of tent city in Penticton

Penticton council’s decision to close a local homeless shelter could create tent city, says David Eby

The first of Fisheries and Oceans Canada’s long-range maritime patrol aircraft—the Dash-8—becomes operational. (Photo supplied by PAL Aerospace)
Fisheries and Oceans Canada’s new De Havilland Dash-8-100 long-range surveillance air craft is capable of staying aloft for eight to 10 hours for a variety of missions up and down the B.C. coast. (Photo supplied by PAL Aerospace)
New plane will double DFO’s surveillance capacity in B.C.

The Dash-8 will fly out of Campbell River for enforecment, conservation missions

A recently published study out of UBC has found a link between life satisfaction levels and overall health. (Pixabay)
Satisfied with life? It’s likely you’re healthier for it: UBC study

UBC psychologists have found those more satisfied with their life have a 26% reduced risk of dying

A vial of some of the first 500,000 of the two million AstraZeneca COVID-19 vaccine doses that Canada has secured through a deal with the Serum Institute of India in partnership with Verity Pharma at a facility in Milton, Ont., on Wednesday, March 3, 2021. THE CANADIAN PRESS/Carlos Osorio - POOL
Federal panel recommends 4-month gap between COVID vaccine doses due to limited supply

The recommendation applies to all COVID-19 vaccines currently approved in Canada

Most Read