Skip to content

Road work hinders Colwood drivers in Royal Bay

Underground utility installation could run most of March
24420205_web1_210304-GNG-ColwoodRoadWork-1_1
Underground utility installations are underway on Latoria Boulevard at Latoria Road near Royal Bay Secondary and on Metchosin Road south of Latoria Boulevard. (City of Colwood image)

Colwood traffic could get a little congested due to roadwork for much of March.

Underground utility installations are underway on Latoria Boulevard at Latoria Road near Royal Bay Secondary and on Metchosin Road south of Latoria Boulevard.

Work started Tuesday and will run through most of the month with single lane alternating traffic expected at times between 7 a.m. and 7 p.m.

Traffic control personnel will be on hand to direct drivers.

The city hopes to have work complete by March 26.

READ ALSO: Colwood approves new single-lane roundabout at intersection with ‘immediate need for improvement’


 

Do you have a story tip? Email: c.vanreeuwyk@blackpress.ca.

Follow us on Twitter and Instagram, and like us on Facebook.