The Juan de Fuca Trail has officially reopened after a lengthy closure for repair. (File photo)

The Juan de Fuca Trail has officially reopened after a lengthy closure for repair. (File photo)

Juan de Fuca Marine Trail re-opens after lengthy repairs

The trail has been closed since February

The Juan de Fuca Marine Trail has been fully reopened by the B.C. Environment Ministry following a five-month-long closure for maintenance that left tourist operators fuming.

A 26-kilometre section of the trail between Mystic Beach and Sombrio Beach has been closed since February.

“Tourism is a big part of our economy in Port Renfrew and a closure like this can have some very serious effects on our economy,” said Ryan Chamberlain, the president of the Sooke to Port Renfrew Tourist Association.

“We are already suffering because of (federal) government restrictions on the sport fishing businesses in Port Renfrew, and this has been just another factor that hurt our efforts to attract tourists.”

The trail was closed when ministry officials said high level of use on the pathways and damage done by winter storms had combined to make sections of it unsafe.

Plans had the trail reopening at the end of April, but those plans went by the wayside when repairs were delayed by inclement weather and a particularly troubling piece of the trail south of Sombrio Beach.

A stair system, in the 21-kilometre section of the 47-kilometre trail, needed replacing, but no stable footing existed at the location to rebuild the stairway. Instead, a specially engineered rock-anchored boardwalk and stairs was designed and installed.

As there was no detour around that section of the trail, it was closed.

“It seems the universe just has it out for Port Renfrew,” said Jon Cash, the co-owner of Soule Creek Lodge in Port Renfrew at the time.

He said at least half of his customers come specifically to hike the trail and described the closure as “just another hit” to the tourist industry.

The ministry said in addition to the work done at Sombrio Beach, there were also improvements made to 24 other locations along the trail.

The work was the second phase of a three-phase project to upgrade the popular trail system and upgrade the infrastructure along the trail route.

RELATED: Port Renfrew left in the cold

The third phase of the improvement project is scheduled to begin next spring, although Environment Ministry officials would not comment on whether the third phase would necessitate any future trail closures.

Dan Hagar, the president of the Port Renfrew Chamber of Commerce, views the 2019 experience as a teachable moment for everyone.

“It’s marvellous that the trail is open again, but it has shown that there has to be a direct line of communication between the ministry and the Port Renfrew Chamber of Commerce,” Hagar said.

“This last experience was very upsetting, but we can all learn from our mistakes. I’m hoping that going forward the communication will be much better. If we know about closures, we can talk to our members and at least keep them informed.”



mailto:tim.collins@sookenewsmirror.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Central Saanich installed a temporary portable along Lochside Trail near Michell’s Farm Market and remains in discussion with the Capital Regional District about finding what Mayor Ryan Windsor called a ‘permanent solution’ to ensuring washroom access at the popular location. (Wolf Depner/News Staff)
Central Saanich in talks with CRD about ‘permanent’ washroom facility near Lochside Trail

The municipality installed a temporary portable washroom near Michell’s Farm Market last week

(Black Press Media file photo)
Bylaw officers called to Saanich park for COVID-19 protocol violations on pickleball court

Raquet sport players reminded to avoid doubles play amid pandemic

A video captured by Twitter user Teddy Jenner of a fire in Beacon Hill Park the night of Jan. 21, 2021. (Twitter/@OfftheCrosseBar)
Fire rips through tents, wooden structures in Beacon Hill Park

Emergency crews say there was no injuries in the blaze

There are many options for enjoying a meal out locally during Dine Around and Stay in Town, on now through Feb. 7. (10 Acres Commons)
Dine Around Stay in Town Victoria carries added importance during pandemic

Special menu items for eat in or takeout/delivery, staycation deals available through Feb. 7

A collage of damaged areas in need of repair in Oak Bay municipal hall, including carpet hazards, missing wall pieces and interior water damage. (District of Oak Bay images)
Oak Bay awards contract for municipal hall renovation

$470,000 will go towards cracked walls, ripped flooring

Businesses continue to struggle under COVID-19 restrictions as the pandemic reaches the one-year mark. (B.C. government)
Another 564 COVID-19 cases, mass vaccine plan coming Friday

15 more deaths, community cluster declared in Williams Lake

Police are searching for an alleged sex offender, Nicole Edwards, who they say has not returned to her Vancouver halfway house. (Police handout)
Police hunt for woman charged in ‘horrific’ assault who failed to return to Surrey halfway house

Call 911 immediately if you see alleged sex offender Nicole Edwards, police say

A screenshot from a local Instagram account video. The account appeared to be frequented by Mission students, and showed violent videos of students assaulting and bullying other students.
Parents, former students describe ‘culture of bullying’ in B.C. school district

Nearly two dozen voices come forward speaking of abuse haunting the hallways in Mission, B.C.

Joe Biden, then the U.S. vice-president, and Prime Minister Justin Trudeau take their seats at the start of the First Ministers and National Indigenous Leaders meeting in Ottawa, Friday, Dec. 9, 2016. THE CANADIAN PRESS/Adrian Wyld
Trudeau, Biden to talk today as death of Keystone XL reverberates in Canada

President Joe Biden opposed the Keystone XL expansion as vice-president under Barack Obama

Prince Edward Island’s provincial flag flies on a flag pole in Ottawa, Friday July 3, 2020. A lozenge plant in Prince Edward Island has laid off 30 workers, citing an “almost non-existent” cold and cough season amid COVID-19 restrictions. THE CANADIAN PRESS/Adrian Wyld
‘Almost non-existent’ cold and cough season: P.E.I. lozenge plant lays off 30 workers

The apparent drop in winter colds across the country seems to have weakened demand for medicine and natural remedies

Robert Riley Saunders. (File)
Disgraced Kelowna social worker faces another class-action lawsuit

Zackary Alphonse claims he was not informed of resources available to him upon leaving government care

Anyone with information on any of these individuals is asked to call 1-800-222-TIPS (8477) or visit the website victoriacrimestoppers.ca for more information.
Greater Victoria Crime Stoppers wanted list for the week of Jan. 19

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

A specialized RCMP team is investigating a suspicious trailer, which might have connections to the illicit drug trade, found abandoned outside a Cache Creek motel. (Photo credit: <em>Journal</em> files)
Police probe U-Haul trailer linked to illicit drugs left outside Cache Creek motel

Hazardous materials found inside believed to be consistent with the production of illicit drugs

Most Read